Juniper Pool Renovation

800 Northeast 6th Street, Bend, OR, USA

Project Phase

  • PLANNING
  • DESIGN
  • PERMITTING
  • CONSTRUCTION

Project Overview

The Juniper Swim & Fitness Center indoor 25-meter pool, small children’s pool, surrounding decks, gutter, and drain system turned 40 years old in 2018.  As one of the most heavily used assets in the district, the reliability and performance of the asset is critical to serving community need.

The scope of work includes renovating or replacing the existing 25-meter and children’s pool tanks/shells, installing new gutter and recirculation piping, replacing the current deck and draining system, possible re-design of the children’s pool, and replacing/upgrading the pool mechanical systems as needed. The indoor pool area including the pools, hot tub, sauna, steam room and adjacent locker rooms will be closed.

The project construction is scheduled to begin at the beginning of 2021 after the Larkspur Center pool is open.  This will reduce the impact of a prolonged closure of the Juniper pools as the renovation will likely require a five month closure of the indoor pool.

800 NE 6th Street

$3 Million

System Development Charges

Spring 2021

Contact Information

For more information on the Juniper Pool Renovation, please contact

Bronwen Mastro

Landscape Architect

Tel: (541) 706-6152

Email: bronwenm@bendparksandrec.org

Design Build Contractor awarded – November 2019

Pool Drained for survey – March 2020

Permit Drawings submitted and project out to bid – June 2020